CONSTRUCTION TIME LAPSE SPECIALISTS
Construction Time Lapse Sydney - Construction Timelapse Sydney
Our Systems
IP66 Rated Enclosure
Integrated DSLR for 4K (Ultra-HD) Capture
Powered by Solar or AC (240V)
Extensive Mounting Options
Live Project Feed
Project Playback
Generate Videos
Project History
B270 Optical Glass
Integrated DSLR for 4K (Ultra-HD) Capture
Powered by AC (240V) or Battery
Extensive Mounting Options
Equipment Capabilities
1.
PAN, TILT & SWIVEL UNIT
Our camera housing unit is IP66 rated for harsh environments. A 100 degree viewing angle specced with B270 optical glass to avoid lens flare and other anomalies.
2.
ULTRA HD (4K) CAPTURE
All our time-lapse content is captured by professional 24MP DSLR camera’s, and OEM lenses that are paired with appropriate polarising, UV and/or neutral density filters.
3.
MAINS OR SOLAR POWERED
We offer two configurations of our units to suit well established and green field sites respectively. Paired with back up UPS’s, there is extensive run time without power and sun.
4.
4G CONNECTIVITY
4G enables our units to work uninterrupted. The high speeds provide capture intervals of up to a minute without causing delays to our client live feed interface.
5.
REMOTE ACCESS
We are able to access our equipment remotely to adjust settings. Great for those milestone dates where an increased capture rate is wanted for a more detailed output.
6.
ADVANCED SCHEDULING
Remotely configure your capture schedules. This could be for every day of the week, 24 hours a day, excluding any days of the week, or even for your Development Approval hours only.
7.
CRITICALLY RELIANT
Our system is highly reliable meaning once our unit is installed you can forget about it. This is due to extensive development and stress testing of our equipment.
8.
DATA MANAGEMENT
As images are captured and stored locally onto SSD’s, they are also transferred to the cloud by 4G as a form of redundancy. This means little to no lead time on post-production to start.
Site Installation
We are also able to engineer custom mounts and infrastructure where it is required. Our team can project manage the design, procurement, certification, and erection of temporary steel structures.